Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12689485

- Product Categories
- Friendly Links
Information Name: | Filling Machine | Hang Jian Bo Beijing waterproof | filling machine needles |
Published: | 2014-09-02 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | [Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd.] (five) in accordance with the acceptance waterproof coating layer waterproof coating construction process, for each procedure carefully check and acceptance, make a record, must pass before the next process of construction . After completion of the waterproof layer and hard work, the quality of the coating to conduct a comprehensive inspection, require full coating, uniform thickness, closed tight grout thickness to meet the design requirements (do a biopsy). No waterproof layer from the dark, cracking, Alice and other defects. The inspection and acceptance tests can be carried out after passing the water, (the water above the standard to 20mm), 24h no leakage, make a record, may be protective layer construction. (Vi) the protection of a finished product. Waterproof layer coating process operation, the operator work wear flat shoes, clothing, etc. of the muscle surface and wall fittings and sleeves, floor drain, fixing clips, etc., not collision damage, displacement. When coated waterproof coating construction, not to pollute the ground in other parts of the wall, doors and windows, electrical boxes. Warm baths pipes, sanitary ware and so on. 2. After each layer waterproof coating layer construction, must be strictly protected, to be located between the kitchen doorway cut into the eye-catching signs, before the protective layer construction, no person shall enter, nor debris piled up on top, so as not to damage the waterproof layer . 3. Floor drain or drain before the waterproof construction, protective measures should be taken to prevent debris entering to ensure smooth drainage, water storage qualified, will clean the floor drain. 4. When waterproof protective layer construction, not mixed in the waterproof layer mortar, mortar shop shovel when not touch waterproof layer, to Seiko doing fine filling machine needles, not damage the waterproof layer. [Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd.] bathroom waterproof construction specifications first, check the base surface of the base surface treatment process is key to ensuring the waterproof construction, must be cleaned before the construction of the base surface, in order to ensure its strong, smooth, clean, No dust debris, if any pores, cracks and other defects must be repaired with cement mortar smooth, yin and yang corner should be wiped into a circular shape. Before construction to keep the base surface moist but not out of water. Second, inspection and supervision of the construction process using a brush or brush brushing the base surface, the intensity of the use of uniform, can not leak brush; normally takes brushing two times (according to the use requirements), each painted a thickness not exceeding 1mm ; time to dry slightly before the previous post-brushing (just sticky, generally spaced 1-2 hours) filling machine parts, front and rear vertical cross brushing, brushing total thickness is 1-2mm; If the coating has been cured, the first wet with water when brushing another. Filling Machine | Hang Jian Bo Beijing waterproof | filling machine needles provided by Hang Jian Bo Beijing waterproof. Beijing Heng Jian Bo Beijing Waterproof Material Co., Ltd. (www.hjbjfs.com/) in waterproof materials, filling materials, high pressure grouting machine, home improvement category waterproof coating, JS waterproof coating and other industries have high visibility, integrity management, quality of service both welcome to inquire or consult our "business alliance customer service" it! |
Admin>>>
You are the 24937 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24937 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility