Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12689485

- Product Categories
- Friendly Links
Information Name: | Beijing Heng Jian Bo waterproof | water-based grout [] | Taiwan grout |
Published: | 2014-06-10 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Doors: Bathroom best to have a window to facilitate ventilation; If no windows, doors with particular attention to detail. To prevent water from the bathroom to the spill, the door is slightly higher than the inner circles Bathroom; door and the ground clearance to leave the bathroom a little too large, in order to facilitate the return air; If you are sliding doors, sliding doors and also in the bathroom a layer of water between the tiles. 5 Circuit laying: wire joints in the bathroom must be linked to tin, and to have to wrap waterproof tape and insulating tape, to ensure safety; wire body must put on the flame tube; All switches and sockets must have proof box grout, and Depending on the position but also the size and location of electrical appliances may be, to ensure ease of use and reasonable. 6 water reform: the bathroom drainage line is best not to do too much change, if you want changes, according to the specific circumstances, such as different models of washing machines, water and the location will be different. 7 sanitary installation: best decoration before the water pitch in mind, selected by size bathtub, shower room, toilet, wash basin and other sanitary ware, so when fitting the wrong size; toilet installation first potty clay seal, then expansion screws or plastic glass fixed, so easy to repair in the toilet clogged. 8 ventilation: exhaust fans must plugging grout between the bathroom and the exhaust fan must be a retrograde gate to prevent backflow of polluted air. 9 Green: Additions angry. Toilet should not be a forgotten corner of the green. You can choose some shade decoration, like a wet pot placed in the bathroom, making it a bit more angry. If you want to learn more waterproof knowledge, we welcome the attention Ankeen official micro-Bo Beijing waterproof Letter: hjbjfs 4, one-component polyurethane: indoor and outdoor use, brushing is very thick, about 3 mm, and more than 300 percent in the bomb tension , very elastic, crack will not make any substrate cracking, water works best. Although the safety performance requirements of environmental control in the column, but such a large waterproof paint smell, it is generally difficult to accept, but very few brands of the environmental performance of non-compliance. Polyurethane gel-like, very thick water-based grout, use the construction scraper, very strenuous, more complicated. After brushing the paint needs to be waterproof grout surface treatment, brushed or sand to increase friction Yang, easy tiling. These paint drying rate affected by climate, in cold climates tide drying speed is relatively slow, but the weather did not affect the waterproof effect. In general, the drying cycle of 24 hours mortar class, acrylic and polyurethane for the drying period of 24-48 hours. "Single component", "two-component" differences: mortar classes are two-component polymer, ie the ratio of the emulsion and the mortar is made; without mortar and polyurethane acrylate ratio, is a single component. Second, according to the type of coating and the coating film by main ingredient classify substances can put waterproof coating types are solvent-based, water emulsion, the reaction type three. 1. Solvent-based waterproof coating in such coatings. As the main film-forming polymer substance is dissolved in an organic solvent, to form a solution. Polymer materials stored in the molecular state solution (paint) in; such coatings have the following special features: volatile solvent through, after contacting the molecular chain of the polymer material, such as processes lap conjunctiva; paint dry fast, thin and dense conjunctiva ; the production process is relatively simple, good paint storage stability; flammable, explosive, toxic, production, pay attention to the safe storage and use; due to the fast evaporation of the solvent, the environment pollution during construction. 2 water emulsion waterproof coating polymer materials such as waterproof coating film forming materials to tiny particles (molecules instead was state) stable suspension (rather than dissolved) in water emulsion coatings become. Beijing Heng Jian Bo waterproof | water-based grout [] | Taiwan grouting material provided by the Beijing Heng Jian Bo waterproof. Search for "waterproof materials, grouting materials, high pressure grouting machine, home improvement category waterproof coating, JS waterproof coating" reliable supplier network operators choose to have the whole alliance certification: Beijing Beijing Heng Jian Bo Waterproof Materials Co., Ltd. (www.hjbjfs. com /), trustworthiness and reliability, "Business League call" on the page now click on live chat with us now! |
Admin>>>
You are the 24937 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24937 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility