Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12689485

- Product Categories
- Friendly Links
- home > Supply > Note slurry | Note slurry manufacturer | Beijing Heng Jian Bo waterproof slurry injection
Information Name: | Note slurry | Note slurry manufacturer | Beijing Heng Jian Bo waterproof slurry injection |
Published: | 2014-02-06 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Single-component waterborne polyurethane waterproof material construction methods Primary treatment: Requirements smooth surface, solid and free of sand, no clear water. Stir scratch material with a brush or rubber sheet, bottoming. Brushing the surface layer: bottom cured, brushing the surface in multiple layers, each over 0.3-0.5mm appropriate (if it is too thick, the film is easy to blister), with each pass scraping the last direction perpendicular to the film thickness are, according to the design requirements, determine scraping layers and coating fabric per times, until it reaches the design thickness. Dilute spreading gravel: If the facade wall plaster slurry injection to the manufacturer, the last layer of coating construction is completed but not yet fully cured, to be sprinkled with a small amount of clean and dilute 2-3mm thick gravel on the surface to increase adhesion of the coating of cement mortar. Acceptance waterproof coating layers: a protective layer before doing must be clean and inspect the construction quality waterproof coating layer coating to keep full, consistent Bohou closed tight, not allowed to have open at the end to see white, from the dark shed Note slurry manufacturers, open attack Alice and other defects, if necessary, check the water to leak was not qualified. Construction of the protective layer: When the coating is fully cured and acceptance, the protective layer can be made of cement mortar or brick paving using traditional methods, mosaics and other surplus materials must be sealed. Grouting plugging basement construction program management team 1, construction workers active in the construction area, allowed to enter the non-construction zone. 2, all construction personnel uniform overalls, entered the construction site. 3, pre-service training of construction personnel to comply with the relevant provisions of the general contractor. Eight, a construction site management, and other flammable products should be stored separately. 2, material neatly stacked. 3, good site management, waste timely removal. Note slurry | Note slurry manufacturer | Beijing Heng Jian Bo waterproof slurry injection provided by the Beijing Heng Jian Bo waterproof. This information consists of: providing Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. (www.hjbjfs.com/), we are business alliance member, the integrity of the whole network authentication provider. Feel free to contact us, contact: Bit Managers |
Admin>>>
You are the 24937 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24937 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Heng Jian Bo Beijing Waterproof Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility